VRA optimistic of ending load shedding by end of 2015 The Volta River Authority says it is determined to resolve the power crisis by the end of this year. It is therefore investing several millions of dollars into additional power generation especially thermal. The Corporate Communications Manager of VRA, Samuel Fletcher who took the media on a facility tour to power stations of the VRA said 260 megawatts will be fed into the system soon. GBC